Call now: 252-767-6166  
Oracle Training Oracle Support Development Oracle Apps

 
 Home
 E-mail Us
 Oracle Articles
New Oracle Articles


 Oracle Training
 Oracle Tips

 Oracle Forum
 Class Catalog


 Remote DBA
 Oracle Tuning
 Emergency 911
 RAC Support
 Apps Support
 Analysis
 Design
 Implementation
 Oracle Support


 SQL Tuning
 Security

 Oracle UNIX
 Oracle Linux
 Monitoring
 Remote s
upport
 Remote plans
 Remote
services
 Application Server

 Applications
 Oracle Forms
 Oracle Portal
 App Upgrades
 SQL Server
 Oracle Concepts
 Software Support

 Remote S
upport  
 Development  

 Implementation


 Consulting Staff
 Consulting Prices
 Help Wanted!

 


 Oracle Posters
 Oracle Books

 Oracle Scripts
 Ion
 Excel-DB  

Don Burleson Blog 


 

 

 


 

 

   

 

  Oracle Database Tips by Donald Burleson

Oracle10g Grid Computing with RAC
Chapter 7 - Cache Fusion and Inter Instance Coordination


GCS Resource Modes and Roles

Basically, the concept of role supplements the access mode characteristic. A typical data block has both of these characteristics.

Concept of Past Image

The past image concept was introduced in the RAC version of Oracle 9i to maintain data integrity. In an Oracle database, a typical data block is not written to the disk immediately, even after it is dirtied. When the same dirty data block is requested by another instance for write or read purposes, an image of the block is created at the owning instance, and only that block is shipped to the requesting instance. This backup image of the block is called the past image (PI) and is kept in memory. In the event of failure, Oracle can reconstruct the current version of the block by reading PIs. It is also possible to have more than one past image in the memory depending on how many times the data block was requested in the dirty stage.

A past image copy of the data block is different from a CR block, which is needed for reconstructing a read-consistent image. A CR version of a block represents a consistent snapshot of the data at a point in time. It is constructed by applying information from the undo/rollback segments. The PI image copy helps the recovery process and aids in maintaining data integrity.

For example, suppose user A of instance 1 has updated row 2 on block 5. Later, user B of instance 2 intends to update row 6 on the same block 5. The GCS transfers block 5 from instance A to instance B. At this point, the past image (PI) for block 5 is created on instance A.
 

The above text is an excerpt from:

Oracle 10g Grid & Real Application Clusters
Oracle 10g Grid Computing with RAC
ISBN 0-9744355-4-6

by Mike Ault, Madhu Tumma

 


   
��  
 
 
Oracle Training at Sea
 
 
 
 
oracle dba poster
 

 
Follow us on Twitter 
 
Oracle performance tuning software 
 
Oracle Linux poster
 
 
 

 

Burleson is the American Team

Note: This Oracle documentation was created as a support and Oracle training reference for use by our DBA performance tuning consulting professionals.  Feel free to ask questions on our Oracle forum.

Verify experience! Anyone considering using the services of an Oracle support expert should independently investigate their credentials and experience, and not rely on advertisements and self-proclaimed expertise. All legitimate Oracle experts publish their Oracle qualifications.

Errata?  Oracle technology is changing and we strive to update our BC Oracle support information.  If you find an error or have a suggestion for improving our content, we would appreciate your feedback.  Just  e-mail:  

and include the URL for the page.


                    









Burleson Consulting

The Oracle of Database Support

Oracle Performance Tuning

Remote DBA Services


 

Copyright © 1996 -  2020

All rights reserved by Burleson

Oracle ® is the registered trademark of Oracle Corporation.